Posted on by admin.elc RSS Feed
0 comments
Meter Install

More Elcomponent Meters at Strathclyde University

 

Following hot on the heels (literally, considering last weeks weather) of the initial phase of automatic sub-metering at Strathclyde Uni, we are delighted to be tasked with adding the Halls of Residence to the system.? Phase I has been delivered in record time thanks to heroic levels of overtime and hard work from the client’s Estates Dept and our own project team, with final commissioning being completed this week.?

Phase II will follow as soon as possible to take advantage of the relative lack of students in campus during the vacation period, utilising a combination of new and existing meters.? Although initially envisaged as a wireless system, the delivered package will be predominantly hard-wired via the existing LAN, as this proved the most cost-effective solution following the detailed site survey we always carry out.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

*