How to Plan a Metering Strategy for a Commercial Building

Commercial Building Metering Strategy

A useful metering strategy starts with the information your organisation needs.

It does not start by deciding how many meters to install.

Commercial buildings can contain tenant areas, communal services, plant, separate floors and many individual electrical loads. Measuring every possible circuit would create a large amount of data, but that does not mean the information would be useful.

A better approach is to decide what the property, facilities or energy team needs to know and then work backwards to the measurement points required.

This creates a metering strategy based on practical requirements rather than hardware alone.

What is a metering strategy?

A metering strategy sets out what will be measured, why it will be measured and how the resulting information will be collected and used.

For a commercial building, this may cover electricity consumption across tenants, floors, plant, departments, communal areas or individual buildings.

It should also consider:

  • existing meters
  • data collection
  • communications
  • monitoring software
  • reporting requirements
  • future changes to the property

The aim is to create a clear relationship between each meter and a practical management requirement.

A well-planned metering strategy helps ensure that each measurement point has a reason to exist and that the resulting data can be used by the people responsible for the property.

Start with the questions you need to answer

Before considering individual meters, identify the questions the data needs to answer.

A property manager may need to understand consumption across separate occupied areas.

A facilities manager may want better information about central plant or shared building services.

An energy manager may need to compare buildings or identify periods of unusual consumption.

These are different requirements and may lead to different measurement points.

Useful questions might include:

  • Which areas account for the largest share of electricity consumption?
  • Do individual tenant areas need to be measured separately?
  • Is communal electricity use clearly understood?
  • Are there particular plant rooms or systems that need monitoring?
  • Do several buildings need to be compared?
  • Is the existing energy reporting too broad?
  • Are there unexplained changes in consumption?
  • Do teams need regular data or occasional readings?

Writing these questions down at the beginning can prevent the project becoming an exercise in installing meters without a defined purpose.

Review the meters already installed

Existing buildings often contain more metering than people realise.

Meters may have been installed during previous fit-outs, tenant changes, refurbishment works or earlier energy projects.

Some may still provide useful information.

Others may have unclear labels, may no longer correspond with the current layout of the building or may not provide the communications needed for automatic data collection.

Before adding new equipment, review the existing installation.

The review should establish:

  • what meters are already present
  • where they are located
  • what each meter measures
  • whether the meter is operating correctly
  • whether its configuration remains suitable
  • whether readings can be collected automatically
  • whether the meter still corresponds with the current use of the building

Elcomponent’s commercial energy management services include audits and surveys designed to review meter suitability, capability, function and configuration.

An initial audit can help distinguish genuine gaps in measurement from meters that already exist but are not currently being used effectively.

Decide which areas need separate measurement

Once the existing arrangement is clear, identify where more detail is required.

A commercial property might need separate measurement for:

  • tenant areas
  • individual floors
  • communal services
  • plant rooms
  • departments
  • major electrical loads
  • separate buildings

Another property may only need a small number of additional measurement points.

The strategy should reflect how the property is actually operated.

A multi-let office building will not necessarily need the same arrangement as a warehouse, retail property or mixed commercial estate.

There is therefore no standard number of sub meters that every commercial building should contain.

Elcomponent’s electrical sub metering systems page provides more information about planning additional electricity measurement around commercial property requirements.

Consider single phase and three phase supplies

Once the required measurement points have been identified, the electrical arrangement needs to be considered.

Some loads may use single phase supplies.

Others may use three phase supplies.

The meter must be appropriate for the circuit being measured.

Larger electrical loads may also require current-transformer-based arrangements rather than direct metering.

These are technical specification decisions that should follow the measurement strategy.

The objective comes first: decide what information is needed.

Meter selection then follows.

For technical information on three phase meters and current transformers, see Elcomponent’s submeter installation guide.

Decide how often you need the data

A metering strategy should also consider frequency.

If the organisation only needs occasional information, manual readings may be sufficient.

If teams need to investigate consumption patterns, compare operating periods or review several properties, more frequent automatic readings may be more useful.

The frequency should match the management task.

Collecting large quantities of high-frequency data without a reason does not automatically improve energy management.

Likewise, taking one reading every few months may provide too little information if the organisation is trying to investigate daily or weekly behaviour.

Define the reporting and analysis requirement before deciding how frequently data should be collected.

Manual readings or automatic collection?

Manual meter reading can be simple where there are only a small number of meters.

A member of staff can visit the meter, record the reading and add it to a spreadsheet or reporting system.

As the number of meters grows, this becomes harder to manage.

Large buildings and multi-site estates can contain many individual meters.

Automatic data collection can reduce the need for routine manual visits and create a more consistent consumption history.

Compatible meters can communicate readings through wired or wireless systems and send the information to a central monitoring platform.

Elcomponent’s MW2 energy monitoring software can receive and present connected energy data through dashboards, reports and analytical tools where the appropriate metering and collection system is in place.

Consider how the data will be used

Data collection is not an end in itself.

The organisation should know who will review the information and what happens when something unusual appears.

A facilities team might investigate plant consumption.

A property manager might review differences between occupied areas.

An energy manager may compare several buildings or look at changes over time.

A managing agent may need a more consistent record across a property portfolio.

The metering strategy should therefore identify not just what will be measured, but who needs the data and what decisions it will support.

For example, if a meter measures a particular plant room but nobody reviews that data, the measurement may have little operational value.

Each data point should connect to a practical requirement.

Plan the communications system

Where automatic collection is required, the metering strategy also needs to consider communications.

Existing commercial buildings can be difficult to cable, particularly where meters are distributed across several floors or buildings.

Some sites may already contain suitable wired infrastructure.

Others may suit wireless monitoring.

The right option depends on the property, the meter locations and the wider monitoring requirement.

Elcomponent provides LoRaWAN energy monitoring for projects where wireless communications are appropriate.

The communications choice should follow a site assessment rather than being selected independently of the rest of the metering system.

Document every meter

Metering systems become difficult to manage when nobody knows what each meter represents.

Documentation should record the meter location, identification, purpose and relevant configuration.

Where communications are used, those settings should also be recorded.

This becomes increasingly important as buildings change.

Tenants may move.

Spaces may be divided or combined.

Plant may be replaced.

New meters may be added.

Without clear documentation, a monitoring platform can continue showing data without users being confident about what the meter actually represents.

Elcomponent’s sub metering system documentation guide sets out information that can support ongoing maintenance and future system changes.

Allow for future property changes

A commercial building rarely remains unchanged indefinitely.

Tenants move.

Layouts change.

Plant is replaced.

New equipment is installed.

Additional buildings may be added to an estate.

A metering strategy should therefore avoid creating a system that only works for the property’s current arrangement.

This does not mean installing unnecessary equipment in anticipation of every possible future change.

It means designing and documenting the system so that future users can understand it and make changes without starting again.

Clear meter identification and sensible system structure can make later alterations easier to manage.

Consider supplier meters and internal metering separately

The main electricity meter associated with the site’s energy supply serves a different purpose from an internal metering strategy.

The supplier meter records overall consumption for the supply.

Internal sub meters provide more detailed information behind that main point.

A commercial building may therefore have a supplier smart meter and a separate internal metering system.

The main meter can show total site consumption, while internal sub meters can separate areas such as tenants, plant, floors or communal services.

For current government information on metering for non-domestic premises, see the Department for Energy Security and Net Zero’s non-domestic smart metering guidance.

Plan for multiple buildings if required

A metering strategy may need to extend beyond one building.

Property owners, managing agents and facilities teams can be responsible for several sites.

If each property uses a different approach to metering and data collection, reporting can become inconsistent.

A wider strategy can help establish common principles across the estate.

For example, the organisation may decide which types of loads should normally be measured, how meters should be identified and how data should be collected.

This does not mean every building needs an identical arrangement.

The individual property still needs to reflect its own electrical distribution and operational requirements.

The strategy simply creates a more consistent approach.

Connect the strategy to wider energy monitoring

Submetering is one part of a broader monitoring system.

Once consumption is measured and collected, software can help the organisation compare readings, review trends and investigate changes.

Elcomponent’s energy monitoring systems combine metering, data collection and monitoring software for commercial and industrial applications.

The overall approach can therefore be thought of as a sequence:

  1. identify the information requirement
  2. review existing meters
  3. choose useful measurement points
  4. specify appropriate meters
  5. establish communications and data collection
  6. present the information to the people who need it
  7. review the data and investigate changes

This creates a clear route from physical measurement to practical energy information.

How should a metering strategy support reporting?

Reporting requirements should influence the strategy from the start.

If a property team needs monthly consumption by building, the measurement points should make that possible.

If an energy manager needs to compare daily consumption across major plant, more frequent readings may be needed.

If a managing agent needs a consistent view across several properties, meter identification and data structure become particularly important.

Thinking about the final report before specifying the meters can prevent gaps later.

It also helps avoid collecting data that nobody uses.

Review the strategy after commissioning

A metering strategy should not disappear into a project folder once installation is complete.

After commissioning, check that the information coming from the system answers the original questions.

Ask:

  • Are all important areas represented?
  • Are meters clearly identified?
  • Is data arriving consistently?
  • Are the readings plausible?
  • Can the intended users access the information?
  • Are reports showing what the organisation needs?
  • Have any gaps become apparent since the system went live?

If not, the issue can be addressed before the system becomes difficult to manage.

Elcomponent’s energy monitoring services include commissioning and ongoing system management.

A good metering strategy starts with purpose

The strongest metering strategies are not necessarily the ones with the most hardware.

They are the ones where each measurement has a reason.

Start with what the organisation needs to know.

Review the equipment already in place.

Identify the missing measurements.

Decide how readings will be collected.

Determine who will use the information.

Then select the meters, communications and software needed to support that requirement.

This approach helps create a system that provides useful information rather than simply producing more data.